Skip to content

Monthly Archives: March 2019

Navigating Through the Maze of Liquidated Ascertained Damages Clause and Forfeiture of Deposit:
Cubic Electronics Sdn Bhd (In Liquidation) V Mars Telecommunication Sdn Bhd Appeal
No. 02(F) – 64 – 09/2016 (W)

  • Post author:zmm_editor
  • Post published:07/03/2019
  • Post category:Construction & Energy/Litigation/Litigation & Arbitration
  • Post comments:0 Comments

08th March 2019 INTRODUCTION For the longest of time, when there is a breach of contract, the innocent party cannot per se recover the Liquidated Ascertain Damages (“LAD”, also commonly…

Continue ReadingNavigating Through the Maze of Liquidated Ascertained Damages Clause and Forfeiture of Deposit:
Cubic Electronics Sdn Bhd (In Liquidation) V Mars Telecommunication Sdn Bhd Appeal
No. 02(F) – 64 – 09/2016 (W)

End of content

No more pages to load

KUALA LUMPUR

D2-5-1 Block D, Solaris Dutamas No.1,
Jalan Dutamas 1,
50480 Kuala Lumpur
Malaysia

Tel : (603) 6207 9331
Fax : (603) 6207 9332
Email : [email protected]

SUBANG JAYA

93B, Jalan SS15/5A
47500 Subang Jaya
Selangor Darul Ehsan
Malaysia

Tel : (603) 5633 7577 / 5611 7577
Fax : (603) 5633 7577
Email : [email protected]

SHAH ALAM

No. 50A, Jalan Badminton 13/29
Seksyen 13, 40100 Shah Alam
Selangor Darul Ehsan
Malaysia

Tel : (603) 5511 6990
Fax : (603) 5511 6991
Email : [email protected]

ALOR SETAR

No. 77B, Tingkat 1
Tuanku Haminah Business Centre
05150 Alor Setar
Kedah Darul Aman

Tel : +6 017 422 7675
Fax: +6 03 6207 9332
Email : [email protected]

Messrs Zain Megat & Murad © 2026, All Rights Reserved,
  • Home
  • Page
  • Project
    • Portfolio
    • Portfolio Two
    • Portfolio Three
    • Portfolio Four
    • Three Columns
    • Four Columns
    • Gallery
    • Modern
  • Shop
    • Shop
    • Shop Details
    • Cart
    • Checkout
    • Wishlist
  • News
    • Blog
    • Blog List
    • Blog Grid Sidebar
    • Blog Standard
    • Blog Details
  • Contact
    • Contact Me
    • Contact Us